Revision: 02-14-06- BEFORE YOU BEGIN - STAIN REQUIREMENTS FOR GAZEBO GAZEBO FLOOR SCREEN # OF GALLONS 2 1
10Santa Cruz2" Nail3/4"3/4"3/4" Marks Plywood sideRough sawn Cedar side2" NailCenter Panels on or in between 3/4" Marks3
11Santa Cruz1234567822" Nails every 8"once all Roof Panels are in place6INSTALLING ROOFPANELS CONTINUEDFollow the same steps as in 6-A to in
12Santa Cruz3/4"3/4"MarkFasciaTwo-1-1/2" Finish Nails to hold all Fascia in place then, once all Fascia in place, add five more1-1/2&qu
13Santa Cruz2-1/2" Screws8INSTALLINGSILL PLATE 7 pcs. Sill Plates 2 x 4 x 40-1/4” 14 pcs. Corner Brace 2 x 4 x 14”Install Window Sill Pla
14Santa Cruz10INSTALLING DRIP EDGE,SHINGLES, METAL CAPAND FINIAL 5 Bundles Shingles (not included) for 10’ 40 feet Drip Edge (not included) for 10’
15Santa CruzCut 17"x 13" piece of screen.Apply Screen to inside of Second Tier.Outsideof TwoTierScreenStaple every 2"Side View17"R
16Santa CruzASSEMBLING SECONDTIER ROOF CONTINUED 8 pcs. 3/8” OSB Triangular Roof PanelsStaple toRoof3" ScrewRafterRafter3" Screw3" Scr
17Santa CruzASSEMBLING SECONDTIER ROOF CONTINUED 1 pc. Metal Roof Cap 8 pcs. Fascia sq.ends 2-1/2 x 21-1/16” 8 pcs. Fascia Trim 3/4” x 1-1/2” x 2-3
Limited ConditionalWarranty *WARRANTYWe warrant the following:1. Every product is warranted from defects in workmanship and manufacturing for one year
2Santa CruzSILL PLATE8 SIDEDRIDGE BLOCKPRE-ASSEMBLEDDOOR PANELSPACERGAZEBOPRE-ASSEMBLEDWALL PANELMETAL ROOF CAPFASCIA TRIMTWO TIERPRE-ASSEMBLEDWALL PA
3Santa CruzWOOD FLOOR KIT1-1/2"Base PlateCenter of Floor Kit4 x 4 Treated Postor 12"x12"Concrete Pier4 x 4 Treated Postor 12"x12&q
4Santa CruzDoor Spacer DO NOTREMOVEWidest Bevelon Ground2ASSEMBLINGWALL PANELS 7 pcs. Pre-assembled Wall Panels 1 pc. Pre-assembled Door Panels2-ASe
5Santa CruzFLUSHGusset Bracket(8) 1-5/8"Screws into each GussetVIEW FROM OUTSIDEVIEW FROM INSIDEGap may vary in between Gussets2-1/2"(6.3cm)
6Santa CruzVIEW FROM BOTTOMVIEW FROM TOPTwo 3"Screws atslight angleCentered over cornerof Gusset BracketBOTTOM VIEW3" Screw10' GAZEBOTO
7Santa CruzRafterRafter3" Screw3" Screw3" Screws4ASSEMBLING ANDERECTING RAFTERSCONTINUED4-CInstall remaining Rafters by inserting screw
8Santa CruzVIEW FROM INSIDEMetal "L"BracketCement Anchor and Screws1-1/4" Screws5ANCHORING GAZEBOCONTINUED5-B5-A:Install a 2” 90 degree
9Santa Cruz5-C5ANCHORINGGAZEBO 1 pc. Assembled Side Wall and Rafters 8 pcs. Stakes (if attaching to ground)2 x 2 x 14” 8 pcs. Metal “L” Brackets an
Commentaires sur ces manuels