16
Santa Cruz
ASSEMBLING SECOND
TIER ROOF CONTINUED
8 pcs. 3/8OSB Triangular Roof Panels
Staple to
Roof
3" Screw
Rafter
Rafter
3" Screw
3" Screw
3" Screws
11-E
RafterRafter
Centered
over corner
VIEW FROM TOP
1-5/8"
Screws
at angle
Screen
Carefully lift the Rafter and Ridge Block assembly on
top of the Gusset Brackets at opposite corners of the
Gazebo second tier. Place Rafter Ends at center of
outside corner of Gusset Bracket as shown. Once
Rafter is in place, attach to Gusset Bracket with two
1-5/8” screws through predrilled holes from underside
of Gusset Bracket into bottom of Rafters as shown.
Install 3” screw through top of remaining Rafters into
Ridge Block as shown in Fig. 1. Once all Rafters are
in place, install 3” screws in underside of Ridge Block
into Rafters as shown in Fig. 2. Attach to Gussets
with 3” screws as in 11-E.
11-F
11-F:
1
2
3
4
5
6
7
8
2
2" Nails every 8"
once all Roof Panels are in place
3/4"
3/4"
3/4"
3/4"
Marks
2" Nail
Center Panels on or in
between 3/4" Marks
Roof Panels Should
Overhang Rafter End
Fig.1
Fig.2
11-E:
Fig.1
Fig.2
11-G
11-G:
Carefully place the Second Tier on top of your Gazebo aligning seam to
Gazebo Seam. Fasten into roof with (8) 3” screws through Wall Panel into
Rafter below as shown in Fig. 1. Staple screen to roof every 2” as shown
in Fig. 2.
Fig.1
Fig.2
Along each Rafter, place a mark 3/4” in on each Rafter to help center Roof Panels as shown in Fig. 1 and Fig. 2. Set first
Roof Panel in place on top as shown in Fig. 2 and temporarily nail with one 2” nail at the top of Roof Panel. Continue with
remaining roof panels. Shift slightly left to right to line up bottom edge of roof panels. Install all remaining Roof Panels,
only temporarily nailing in place, with two 2” nails at bottom corners. Once all Roof Panels are in place and fit properly on
your Second Tier, then nail through Roof Panel into Rafters every 8” with 2” nails.